EC-15.2 Capstone I: Design, Plan and Feasibility
You can take a proposal through to a design that could be built, demonstrate feasibility on the part you are least sure about, produce a bill of materials and a schedule that account for lead times, and pass a first-stage review.
Before:OE1-1. Technical Writing SkillsOE1-4. Principles of Entrepreneurship and StartupsEC-14. Engineering Design and System Integration
The first stage exists to answer one question: is this buildable by these people in this time. That is why the feasibility demonstration is on the riskiest element rather than the easiest, and why lead times appear here rather than being discovered later. The hours are larger than elsewhere in the area because a capstone stage is a term of work.
Work through these
From proposal to a design that could actually be built
Architecture, interfaces, component choices and calculations that show the design meets its requirements. The test is whether someone else could start building from what you have written.
NPTEL: Product Design and Innovation (IIT Guwahati) · CourseA feasibility demonstration on the riskiest element
Build the smallest thing that proves the frightening part works. Doing this in the first stage is what turns an unknown into either a solved problem or a change of plan while there is still time.
NPTEL: Design Thinking, a Primer (IIT Madras) · CourseThe bill of materials, with lead times and alternatives
Every part, its cost, where it comes from and how long it takes to arrive. A component with an eight-week lead time discovered in the second stage has ended more projects than any technical difficulty.
NPTEL: Project Management (IIT Kanpur) · CourseA schedule with slack where it is needed
Tasks, dependencies and the ones that cannot start until something else finishes. Putting the slack next to the uncertain tasks rather than at the end is what makes a schedule survive contact with reality.
NPTEL: Project Management (IIT Kanpur) · CourseSafety, ethics and approvals, considered now
Mains voltages, radio transmission, anything involving people or their data, and anything that could injure someone. Whatever permission is needed takes time, and the first stage is when to find out.
NPTEL: Ethics in Engineering Practice (IIT Kharagpur) · CourseThe first-stage review, and what it should conclude
Either the project is feasible as planned, or it needs a stated change, or it should be replaced. A review that concludes only that progress has been made has not done its job.
NPTEL: Project Management (IIT Kanpur) · Course
Sign in to keep your progress.
Free resources
We haven't checked most of these for screen reader use yet.
- FreeNPTEL / IIT Guwahati · CourseNPTEL: Product Design and Innovation (IIT Guwahati)
- FreeNPTEL / IIT Madras · CourseNPTEL: Design Thinking, a Primer (IIT Madras)
- FreeNPTEL / IIT Kanpur · CourseNPTEL: Project Management (IIT Kanpur)
- FreeNPTEL / IIT Kharagpur · CourseNPTEL: Ethics in Engineering Practice (IIT Kharagpur)
Links last checked 3 Sept 2026.
Stuck here?
Ask a mentor. A real person answers, and they can see exactly which topic you're on. Usually within a couple of working days.
Checking your session…
Topics shown in module order.